Phase II is the design, bidding, and construction of a combination of gravity sewers and low-pressure sewers to service the Meetinghouse Pond area. The figure below shows the layout of the collection system and pumping station.

At the Special Town Meeting on October 16th, 2023 the Town voted to expand the Meetinghouse Pond Sewer Collection System Area to include Tides End Lane and Hayward Lane to add approximately 4,000 linear feet of low pressure sewer.

Meetinghouse Pond_Extenstion

Meetinghouse Pond Area Sewer Grid


Meetinghouse pond Area Collection System Components Preliminary

  • Approximately 18,750 Linear Feet of 8-inch through 18-inch PVC Gravity Sewer
  • Approximately 7,460 Linear Feet of 8-inch PVC Force Main
  • Approximately 20,750 Linear Feet of.1.5-inch through 3-inch Low-Pressure Sewer
  • Approximately 4,000 Linear Feet of  1.5-inch through 2-inch Low-Pressure Sewer added to the extension on Tides End Lane and Hayward Lane
  • 1 Submersible Pumping Station
  • Approximately 490 Users will be connected to the system

Overall Project Schedule (To be updated by the Contractor regularly)