Phase 2 - Meetinghouse Pond Area

Phase II is the design, bidding, and construction of a combination of gravity sewers and low-pressure sewers to service the Meetinghouse Pond area. The figure below shows the preliminary layout of the proposed collection system and pumping station.

Water Quality and Wastewater Planning Services
Utility Map Meetinghouse Pond

Meetinghouse pond Area Collection System Components Preliminary

  • Approximately 15,750 Linear Feet of 8-inch through 12-inch PVC Gravity Sewer
  • Approximately 7,500 Linear Feet of 8-inch PVC Force Main
  • Approximately 37,750 Linear Feet of.1.5-inch through 3-inch Low-Pressure Sewer
  • 1 Submersible Pumping Station
  • Approximately 490 Users will be connected to the system