Amended CWMP Draft, July 2016

  1. AECOM Draft ACWMP 06-30-2016 (PDF)
  2. APP A MEPA Certificate 01-28-2010 (PDF)
  3. APP B CCC Approval of Orleans CWMP as a Development of Regional Impact (PDF)
  4. APP C Response to Comments From CWMP (PDF)
  5. APP D Site Evaluation Matrix from Consensus Plan 12-16-2014 (PDF)
  6. APP E 1.a.2 Hydrogeologic Evaluation Proposed Effluent Disposal Facilities 06-02-2016 (PDF)
  7. APP F 1.b.5 Updated Downtown Build-out Analysis and Land Use / Market Conditions 03-13-2016 (PDF)
  8. APP G 1.b.67 Downtown Future Growth Scenarios Strategies to Limit Growth 05-04-2016 (PDF)
  9. App H 1.b.8 Management of Future Downtown Wastewater Flows 06-22-2016 (PDF)
  10. App I 1.c.9 Collection System Technologies 05-21-2016 (PDF)
  11. APP J 1.c.10 WW Treatment Residuals Septage Effluent Transmission 04-04-2016 (PDF)
  12. APP K 1.c.12 Water Reuse Systems 05-26-2016 Rev. 06-22-2016 (PDF)
  13. APP L 2.c.2 Tri-Town Facility Design for Demolition and Operating Cost 02-04-2016 (PDF)
  14. APP M 3.a.1 Site Characterization and Evaluation for Floating Constructed Wetlands 05-25-16 (PDF)
  15. APP N 3.a.2 Work Plan for Floating Constructed Wetland 05-25-2016 (PDF)
  16. APP O 3.b.3 Site Characterization and Evaluation for Aquaculture / Shellfish Propagation 03-13-2016 (PDF)
  17. APP P 3.b.4 Shellfish Cultivation - Preliminary Engineering Design and Work Plan for Preferred Site 05-04-2016 (PDF)
  18. APP Q 3.c.5 Site Characterization and Evaluation for Permeable Reactive Barriers 05-19-2016 (PDF)
  19. APP R 3.c.6 Preliminary Engineering Work Plan for Permeable Reactive Barriers 05-19-2016 (PDF)
  20. APP S 4.a.1 Adaptive Management Plan Water Quality Monitoring and Modeling 05-04-2016 (PDF)
  21. Key Issues on ACWMP 11-09-2016 (PDF)
  22. Summary of Comments to ACWMP 10-19-2016 (PDF)