2011 Comprehensive Wastewater Management Plan
-
Amended CWMP Draft, July 2016
View the Amended CWMP Draft documents.
-
Cedar Pond (PDF)
Cedar Pond in Orleans is confronted with water quality issues likely due to various environmental.contribıutina factors.
-
CWMP / Wastewater Archives
Browse the documents relating to the Comprehensive Wastewater Management Plan and view the wastewater archives.
-
Downtown Plan (PDF)
In addition to evaluating "non-traditional" technologies, a component of the Water Quality and Planning effort currently on-going with the Town of Orleans.
-
Financial Model & Program Cost
Please note that the Financial Model and Program Cost Estimates are current as of their transmittal date.
-
Financial Planning
Access the financial planning documents.
-
Freshwater Ponds Management
Explore the freshwater ponds management documents.
-
Meetinghouse Pond Plan (PDF)
In addition to evaluating “non-traditional” technologies, a component of the Water Quality and Planning effort currently on-going with the Town of Orleans (Town) includes evaluating conventional treatment options to address areas of the town where non-traditional technologies would not be sufficient to address water quality, regulatory, economic development and other needs.
-
Notice of Project Change, Oct 2018
Read about the October 2018 notice of project change.
-
Orleans Downtown Collection System Preliminary plans March 13, 2019 (PDF)
See the preliminary plans for Orleans's downtown collection system.
-
OWQAP Meetings & Key Documents
The Orleans Water Quality Advisory Panel, or OWQAP, was convened to guide studies and assessments, define preferred approaches, seek consensus and build widespread community support for a customized, affordable water quality management plan for the Town of Orleans.
-
Permeable Reactive Barrier Work
The Eldredge Parkway Demonstration Test Permeable Reactive Barrier (PRB) was installed at the parking lot area southwest of the Nauset Middle School in November 2016.
-
Sites & Siting
View the list of sites and siting documents.
-
Technical Reports, Documents & Information
Review the technical reports, documents, and more information.
-
Tri-Town Plant
The Orleans Brewster Eastham Ground water Protection acting through the Town of Orleans Town Administrator will receive sealed bids for Tri-Town Septage Treatment Facility Demolition.
-
Wastewater & Septage Technologies
Learn more about wastewater and septage technologies.
-
Watershed Alternatives Development
Access information about watershed alternatives development.