Construction Schedule Update on
 Orleans, MA Wastewater Infrastructure Project

Two-Week Look Ahead Starting May 23rd, 2022

Notice for Downtown Sewer Abutters: Please refer to the Town of Orleans website for the current notice: https://www.town.orleans.ma.us/CivicAlerts.aspx?AID=55

We are encouraging properties in the Downtown Area to begin the process of hiring an engineer for sewer service connections as soon as possible. 

Every week the construction contractors for Contract No. 2019-01 – Downtown Area Wastewater Treatment Facility and Effluent Disposal, Daniel O’Connell’s Sons, Inc. and Contract No. 2019-02 – Downtown Area Collection System and Pumping Stations, Robert B. Our Co., Inc. provide a “two-week look ahead” that summarizes anticipated construction activity in the planned project area.

Contract No. 2019-01 – Downtown Area Wastewater Treatment Facility and Effluent Disposal

During the next two weeks, construction crews and detours are scheduled to be at the following locations:

  • 29 Overland Way: Expect construction traffic and equipment to be entering and exiting at Bay Ridge Lane.  Work includes installing drainage, plumbing, HVAC, electrical, and process piping and equipment.
  • 32 Lots Hollow Road: Expect construction traffic and equipment to be entering and exiting at Lots Hollow Road.  Work includes installing monitoring wells.

Contract No. 2019-02 – Downtown Area Collection System and Pumping Stations Area

During the next two weeks construction crews and detours are scheduled to be at the following locations:

  • Main Line Crew 1: Stop & Shop constructing/installing sewer castings.
  • Main Line Crew 2: Pump Station #2 (Library) completing earthwork and hardscaping.
  • Traffic Delays/Detours (See detour plans on the “Construction Activities and Detours” webpage):

The plans, system map and additional information are available on the Phase 1 Downtown Area page. For more information please contact Martin “Reggie” Donoghue, P.E. or call at 508-833-6967.

Please note that this is a projected schedule and is subject to adjustment based on the Contractor’s actual progress and the weather.  On an as needed basis auxiliary crews will be performing pipe and manhole testing, interior manhole work, raising manhole covers in preparation for paving, paving and performing general cleanup at various locations throughout the project area.